Toggle menu
Toggle preferences menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

Related changes

More actions

Enter a page name to see changes on pages linked to or from that page. (To see members of a category, enter Category:Name of category). Changes to pages on your Watchlist are in bold.

Recent changes optionsShow last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Hide registered users | Hide anonymous users | Hide my edits | Show bots | Hide minor edits
Show new changes starting from 08:26, 15 June 2026
 
Page name:
List of abbreviations:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes

11 June 2026

10 June 2026

N    14:35  Heating Systems 2 changes history +295 [Morgan Allen (2×)]
     
14:35 (cur | prev) +26 Morgan Allen talk contribs
N    
14:04 (cur | prev) +269 Morgan Allen talk contribs (Created page with "* Heating System Electrical Installation Guide * Y-Plan Wiring Reference Pack * S-Plan Wiring Reference Pack * S-Plan Plus / Zoned Systems Reference Pack * Combi Boiler Control Wiring Reference Pack * Underfloor Heating Electrical Reference Pack")
N    13:56  RCD/RCBO Tripping diffhist +3,643 Morgan Allen talk contribs (Created page with "= RCD Fault Finding Checklist = == Purpose == To provide a structured, practical method for identifying why an RCD is tripping and locating the fault safely and efficiently. == Common Reasons An RCD Trips == * Earth leakage on a circuit (most common cause) * Faulty appliance plugged into a socket circuit * Damaged cable (nails, screws, heat, crushing) * Moisture ingress into accessories or outdoor equipment * Neutral-to-earth fault anywhere on the protected side * Inc...")
N    13:47  Consumer Unit Change Checklist diffhist +4,326 Morgan Allen talk contribs (Created page with "= Consumer Unit Replacement Procedure = == Purpose == To safely replace an existing consumer unit with a new unit, ensuring all circuits are correctly reconnected, protected by the appropriate protective devices, and left in a safe working condition. == Procedure == === 1. Confirm The Scope Of Work === * Identify the existing consumer unit and all outgoing circuits. * Check for signs of damage, overheating, or outdated equipment. * Confirm whether the replacement is l...")
N    13:42  Socket Replacement 2 changes history +2,011 [Morgan Allen (2×)]
     
13:42 (cur | prev) −107 Morgan Allen talk contribs
N    
12:21 (cur | prev) +2,118 Morgan Allen talk contribs (Created page with "= Socket Replacement Procedure = == Purpose == To ensure socket outlets are replaced safely, correctly and in accordance with company standards. == Required Equipment == * Approved Voltage Indicator * Proving Unit * Lock Off Kit * Hand Tools * Appropriate Test Equipment == Procedure == === 1. Assess The Existing Installation === * Inspect the condition of the existing socket and surrounding area. * Identify any signs of overheating, damage or poor workmanship. * C...")
N    12:31  Light Switch Replacement diffhist +1,412 Morgan Allen talk contribs (Created page with "= Light Switch Replacement Procedure = == Purpose == To safely replace a faulty, damaged or outdated light switch. == Procedure == === 1. Confirm The Circuit === * Identify the switch and the light(s) it controls. * Check whether it is a 1-way, 2-way or intermediate switch. === 2. Isolate The Circuit === * Follow the JME Safe Isolation Procedure. * Lock off and prove dead before starting work. === 3. Remove The Existing Switch === * Remove the faceplate. * Check...")
N    12:18  Safe Isolation Procedure diffhist +1,645 Morgan Allen talk contribs (Created page with "= Safe Isolation Procedure = == Purpose == To ensure electrical circuits are safely isolated and proven dead before any work is carried out. == Required Equipment == * Approved Voltage Indicator * Proving Unit * Lock Off Device * Warning Tag == Procedure == === 1. Identify The Correct Circuit === Confirm the circuit or equipment to be worked on and identify the correct means of isolation. === 2. Inform Relevant Persons === Advise the customer, occupier or any af...")
     11:45  Day One Checklist diffhist +1,587 Morgan Allen talk contribs
N    11:43  Customer Communication diffhist +1,488 Morgan Allen talk contribs (Created page with "= Customer Communication = == Purpose == Professional communication is a key part of every job. Customers may not fully understand electrical work, so it is important that JME operatives communicate clearly, respectfully and professionally at all times. == On Arrival == * Introduce yourself and confirm the reason for your visit. * Be polite, friendly and approachable. * Explain what work you will be carrying out. * Confirm any power interruptions before commencing wo...")
N    11:39  Van Stock Standards 2 changes history +1,667 [Morgan Allen (2×)]
     
11:39 (cur | prev) −14 Morgan Allen talk contribs (Connectors & Consumables)
N    
11:38 (cur | prev) +1,681 Morgan Allen talk contribs (Created page with "= JME Van Stock Standards = == Purpose == To ensure all JME electricians maintain a consistent stock level to maximise first-time fixes and reduce unnecessary supplier visits. == Essential Accessories == The following items shall be carried on every van: * 1 Gang Socket * 2 Gang Socket * Switched FCU * Unswitched FCU * 1 Gang Light Switch * 2 Gang Light Switch * Intermediate Switch * Pull Cord Switch * 20A Double Pole Switch * Pendant Set == Consumer Unit Stock ==...")

9 June 2026

N    16:49  Toolbox Talks diffhist +136 Morgan Allen talk contribs (Created page with "Safe Isolation Refresher Working At Height Ladder Safety Manual Handling Electrical Fire Risks Arc Fault Awareness Customer Safety")
N    16:49  Day One Checklist diffhist +18 195.180.36.157 talk (Created page with "Morgan loves willy")
N    16:49  Company Standards diffhist +177 Morgan Allen talk contribs (Created page with "JME Cable Routing Standards JME Labelling Standards JME Testing Standards JME Photo Standards JME Customer Handover Standards JME Van Stock Standards JME Uniform Standards")
N    16:48  Testing and Certification diffhist +157 Morgan Allen talk contribs (Created page with "Minor Works Workflow EIC Workflow EICR Workflow Continuity Testing Insulation Resistance Testing Polarity Testing RCD Testing Photo Evidence Standards")
N    16:48  Fault Finding diffhist +186 Morgan Allen talk contribs (Created page with "RCD Tripping RCBO Tripping MCB Tripping No Power To Property No Power To Circuit Lighting Faults Socket Circuit Faults Intermittent Faults Loose Neutral Faults Broken Ring Final")
N    16:47  Consumer Units diffhist +159 Morgan Allen talk contribs (Created page with "Consumer Unit Change Checklist RCBO Replacement MCB Replacement RCD Replacement SPD Installation Board Labelling Standards Consumer Unit Testing Sequence")
N    16:47  Domestic Installations diffhist +223 Morgan Allen talk contribs (Created page with "Socket Replacement Light Switch Replacement FCU Replacement Adding A Socket Adding A Spur Cooker Connection Electric Shower Connection Extractor Fan Replacement Smoke Alarm Replacement Outside Lighting Installation")
N    16:46  Safe Isolation diffhist +111 Morgan Allen talk contribs (Created page with "Safe Isolation Procedure Lock Off Procedure Proving Unit Checks Isolation Checklist Common Isolation Errors")